Bailiwick Road Bridge over the Byram River
Rehabilitation of Bridge #05491
Town of Greenwich, Connecticut
  • Home
  • Project Status
  • Scope
  • Project Photos
  • Notices
  • FAQ
  • Hydrologic Report Completed
    Project Status

    A hydrologic report was completed and submitted to the Town of Greenwich on October 15, 2009.

    2 Comments

    Jack Stoecker

    December 9th, 2009

    I would like to get a copy of the Hydraulic report for the Bailiwick Road Bridge and a copy of the hydrologic analysis. I am working with the Byram River Coalition and want to make the report available to the group that will be developing a the hydrologic model for the Byram river.

    Please let me know how to obtain the documents.

    Sincerely,

    Jack Stoecker
    (203) 861 0077

    sbartkus

    December 14th, 2009

    The Hydrologic Report has been completed but requires an additional scope of services. These services have been approved by the Town and we are therefore moving forward in our studies. When the Hydrologic Report is approved by the Town it will posted for viewing.

    Leave a Comment